Malaysia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "end mill cobalt dia"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1/4", 3/4", 1 1/4", 1/2", 1/8"
Flute Length
1 5/8", 1.625", 13/16", 0.8125", 12 mm, 0.098", 4.2 mm
Overall Length
6 1/2", 4 3/4", 3 3/4", 3 1/8", 4 1/4"
R Size
0.09", 0.03", 0.25", 0.06", 0.12"
Number of Flutes
7, 4, 3, 2, 6
Square End Mills
941 Items
Shank Diameter
16 mm, 12 mm, 10 mm, 3/16"
Outer Diameter
0.625", 5/8", 1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32"
Flute Length
0.3125", 5/16", 1/2", 0.5", 0.75", 3/4", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
8, 6, 4, 7
Brands
2 Hasil
OSG
965 Produk
Cleveland
245 Produk
Produk
2,030 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 10 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
3.123.456
YG-1 Tool Company 11309CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13/32", Loc 13/16
MOQ: 2
Rp
1.888.074
YG-1 Tool Company 11303CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11/32", Loc 9/16
MOQ: 2
Rp
1.933.245
YG-1 Tool Company 11298CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 17/64", Loc 9/16
Rp
5.865.889
Osg 5434100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/8", Jarak 1-7/8", Panjang Total 6-1/8"
Rp
4.797.264
Osg 5433100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/4", Jarak 1-5/8", Panjang Total 5-5/8"
Rp
4.173.068
Osg 5429900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 11/16", Jarak 1-5/8", Panjang Total 5-5/8"
Rp
3.614.979
Osg 5429605 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
5.695.741
Osg 5428200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 15/16", Jarak 1-7/8", Panjang Total 6-3/8"
Rp
4.901.305
Osg 5428100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 13/16", Jarak 1-7/8", Panjang Total 6-1/8"
Rp
4.885.362
Osg 5424100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/8", Jarak 1-7/8", Panjang Total 6-1/8"
Rp
4.058.628
Osg 5423100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/4", Jarak 1-5/8", Panjang Total 5-5/8"
Rp
4.295.388
Osg 5422105 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Keseluruhan 5"
Rp
3.566.235
Osg 5421105 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
5.991.278
Osg 5324100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 7/8", Jarak 1-7/8", Panjang Total 6-1/8"
Rp
4.983.126
Osg 5323100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 3/4", Jarak 1-5/8", Panjang Total 5-5/8"
Rp
3.868.689
Osg 5229800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 9/16", Jarak 1-1/8", Panjang Total 4-1/2"
Rp
6.414.907
Osg 5228200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 31/32", Jarak 1-5/8", Panjang Total 5-7/8"
Rp
5.956.048
Osg 5228100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 15/16", Jarak 1-5/8", Panjang Total 5-7/8"
Rp
4.129.317
Osg 5227300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 19/32", Jarak 1-1/8", Panjang Total 4-1/2"
Rp
4.041.219
Osg 5227200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 17/32", Lokator 1-1/8", Panjang Total 4-1/2"
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
5.096.833
Osg 5224100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 7/8", Jarak 1-9/16", Panjang Total 5-1/2"
Rp
5.165.139
Osg 5223105 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/4", Jarak 1-5/16", Panjang Total 5"
Rp
3.665.739
Osg 5222100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5/8", Jarak 1-1/8", Panjang Total 4-1/2"
Rp
3.950.969
YG-1 Tool Company 44359 Mata Frais Ujung Bola: Kobalt, 4 Alur,
Dia
meter Frais 3/4", Panjang Potong 3", Panjang Keseluruhan 5-1/4"
Rp
2.676.600
YG-1 Tool Company 41321CN Ball
End
Mill
: Kobalt, Berlapis Tin, 2 Alur,
Dia
meter Pemotong 1/2", Loc 1", Oal 3"
MOQ: 2
Rp
1.910.018
Osg 5819300 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 14,5 mm, Jarak Antar Mata Bor 34,92 mm, Panjang Keseluruhan 85,7 mm
MOQ: 2
Rp
1.910.018
Osg 5819200 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 13,5 mm, Jarak Antar Mata Bor 34,92 mm, Panjang Keseluruhan 85,7 mm
MOQ: 2
Rp
1.383.815
Osg 5818400 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 6,5 mm, Jarak Antar Mata Bor 15,87 mm, Panjang Total 61,9 mm
MOQ: 2
Rp
1.383.815
Osg 5818300 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 5,5 mm, Jarak Antar Mata Bor 14,28 mm, Panjang Total 61,9 mm
MOQ: 2
Rp
1.389.083
Osg 5818100 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 3,5 mm, Jarak Antar Mata Bor 11,11 mm, Panjang Total 60,3 mm
Rp
3.805.514
YG-1 Tool Company 43350 Ball
End
Mill
: Kobalt, 4 Flute,
Dia
meter
Mill
ing 11/16", Loc 1-5/8", Oal 3-3/4"
Rp
2.916.017
YG-1 Tool Company 41328 Ball
End
Mill
: Kobalt, 2 Flute,
Dia
meter
Mill
ing 9/16", Loc 1-1/8", OAL 3-1/8"
Rp
4.530.681
YG-1 Tool Company 13350CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 11/16", Loc 1-5/8"
Rp
5.061.236
YG-1 Tool Company 11394CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 7/8", Loc 1-9/16"
Rp
3.927.100
YG-1 Tool Company 11330CN Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 9/16", Loc 1-1/8"
Rp
2.854.674
Osg 5420405 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/16", Loc 3/4", Panjang Total 3-1/2"
Rp
2.852.795
Osg 5420205 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/16", Loc 1/2", Panjang Total 3-1/4"
Rp
2.730.888
Osg 5417100 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 3/8", Lokasi 3/8", Panjang Total 2-1/8"
Rp
2.719.022
Osg 5417000 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 1/4", Lokasi 1/4", Panjang Total 2-1/16"
Rp
3.446.709
Osg 5412000 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 5/8", Panjang Total 2-3/4"
Rp
3.049.148
Osg 5411000 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1/2", Panjang Total 2-1/2"
MOQ: 2
Rp
1.589.971
Osg 5410200 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
MOQ: 2
Rp
1.386.609
Osg 5400200 Mata Bor Ujung Persegi: Kobalt, 4 Alur,
Dia
meter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
Rp
9.891.440
Osg 5356200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/2", Jarak 4", Panjang Total 6-1/2"
Rp
8.004.878
Osg 5356100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/4", Jarak 4", Panjang Total 6-1/2"
MOQ: 2
Rp
1.531.148
Osg 5310200 Mata Bor Ujung Persegi: Kobalt, 3 Alur,
Dia
meter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
Rp
9.215.109
Osg 5306300 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-3/4", Lokasi 2", Panjang Total 4-1/2"
Rp
7.587.388
Osg 5306200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/2", Lokasi 2", Panjang Total 4-1/2"
Rp
6.326.213
Osg 5306100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/4", Lokasi 2", Panjang Total 4-1/2"
Rp
4.559.222
Osg 5303300 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1", Jarak 1-7/8", Panjang Total 4-1/8"
Rp
7.110.983
Osg 5276100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/4", Lokasi 3", Panjang Total 7-1/4"
Rp
5.539.749
Osg 5275100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1", Jarak 2-1/2", Panjang Total 7-1/4"
MOQ: 2
Rp
1.670.327
Osg 5270200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-11/16"
Rp
8.960.666
Osg 5256300 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-3/4", Lokasi 3", Panjang Total 5-1/2"
Rp
7.431.854
Osg 5256200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/2", Lokasi 3", Panjang Total 5-1/2"
Rp
6.416.968
Osg 5256100 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/4", Lokasi 3", Panjang Total 5-1/2"
Rp
6.416.968
Osg 5255300 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/4", Lokasi 3", Panjang Total 5-1/2"
Rp
5.968.051
Osg 5255200 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 1-1/8", Lokasi 3", Panjang Total 5-1/2"
MOQ: 2
Rp
1.823.249
Osg 5209700 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 15/32", Lokasi 13/16", Panjang Total 2-1/2"
MOQ: 2
Rp
1.821.188
Osg 5209500 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 13/32", Lokasi 13/16", Panjang Total 2-1/2"
1
8
9
10
11
12
15
Atas