Malaysia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "cobalt flute oal"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1/4", 3/4", 1 1/4", 1/2", 1/8"
Flute Length
1 5/8", 1.625", 13/16", 0.8125", 12 mm, 0.098", 4.2 mm
Overall Length
6 1/2", 4 3/4", 3 3/4", 3 1/8", 4 1/4"
R Size
0.09", 0.03", 0.25", 0.06", 0.12"
Number of Flutes
7, 4, 3, 2, 6
Square End Mills
941 Items
Shank Diameter
16 mm, 12 mm, 10 mm, 3/16"
Outer Diameter
0.625", 5/8", 1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32"
Flute Length
0.3125", 5/16", 1/2", 0.5", 0.75", 3/4", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
8, 6, 4, 7
Brands
3 Hasil
OSG
927 Produk
YG-1 TOOL COMPANY
794 Produk
Cleveland
172 Produk
Produk
1,893 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 11 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
5.624.185
Cleveland C42720 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1-1/4", Jarak 2", Panjang Total 4-1/2"
MOQ: 2
Rp
1.352.151
Cleveland C42691 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/16", Jarak 3/4", Panjang Total 2-1/2"
MOQ: 2
Rp
1.349.206
Cleveland C42689 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Lok 5/8", Panjang Total 2-7/16"
MOQ: 2
Rp
1.369.637
Cleveland C42686 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
MOQ: 2
Rp
1.265.735
Cleveland C42607 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1/4", Lokator 1/2", Panjang Total 2-7/16"
Rp
15.996.844
Cleveland C32699 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 1-1/2", Jarak 8", Panjang Total 11-1/2"
Rp
7.006.430
Cleveland C32669 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Jarak 4", Panjang Total 6-1/2"
Rp
12.589.432
Cleveland C32609 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 6 Alur, Diameter Mata Bor 2", Jarak 4", Panjang Total 7-3/4"
Rp
5.016.603
Cleveland C32603 Mata Bor Ujung Persegi: Kobalt, Dilapisi Timah, 4 Alur, Diameter Mata Bor 1", Jarak 2", Panjang Total 4-1/2"
Rp
20.977.279
Cleveland C31208 Mata Bor Kasar: Kobalt, 6 Alur, Pitch Kasar, Diameter Mata Bor 2", Lok 4", Panjang Total 7-3/4"
Rp
8.204.707
Cleveland C31199 Mata Bor Kasar: Kobalt, 5 Alur, Pitch Kasar, Diameter Mata Bor 1", Loc 4", Panjang Keseluruhan 6-1/2"
Rp
7.390.057
Cleveland C31198 Mata Bor Kasar: Kobalt, 5 Alur, Pitch Kasar, Diameter Mata Bor 1", Lokator 3", Panjang Keseluruhan 5-1/2"
Rp
6.651.792
Cleveland C31197 Mata Bor Kasar: Kobalt, 5 Alur, Pitch Kasar, Diameter Mata Bor 1", Lokator 2", Panjang Total 4-1/2"
Rp
5.645.766
Cleveland C31166 Mata Bor Kasar: Kobalt, 5 Alur, Pitch Halus, Diameter Mata Bor 1", Loc 1", Panjang Total 3-1/2"
Rp
6.378.141
Cleveland C30838 Mata Bor Kasar: Kobalt, 5 Alur, Pitch Halus, Diameter Mata Bor 1", Lokasi 2", Panjang Total 4-1/2"
MOQ: 2
Rp
1.898.027
Osg 5828400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 6,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.875.802
Osg 5828300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 5,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.607.028
Osg 5827400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 2 mm, Jarak 5,95 mm, Panjang Total 57,1 mm
Rp
5.116.548
Osg 5823200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 20 mm, Jarak 39,68 mm, Panjang Total 139,7 mm
Rp
3.728.551
Osg 5821400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 15 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
3.722.661
Osg 5821300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 14 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.670.204
Osg 5821200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 13 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.090.414
Osg 5821100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 12 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.112.456
Osg 5820900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 11 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.049.967
Osg 5820800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 10 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Keseluruhan 95,2 mm
MOQ: 2
Rp
1.821.274
Osg 5820500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 7 mm, Jarak 14,28 mm, Panjang Total 79,3 mm
MOQ: 2
Rp
1.800.107
Osg 5820200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 4 mm, Jarak 11,11 mm, Panjang Total 79,3 mm
Rp
4.096.487
YG-1 Tool Company 43350CN Ball End Mill: Kobalt, Berlapis Tin, 4
Flute
, Diameter Mill 11/16", Loc 1-5/8",
OAL
3-3/4"
Rp
8.457.192
YG-1 Tool Company 73477 Mata Bor Kasar: Kobalt, 6 Alur, Diameter Mata Bor 2", Loc 2", Panjang Total 4-1/2"
Rp
8.457.192
YG-1 Tool Company 73475 Mata Bor Kasar: Kobalt, 6 Alur, Diameter Mata Bor 2", Loc 2", Panjang Total 4-1/4"
Rp
8.517.011
YG-1 Tool Company 07478 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 2", Loc 2", Panjang Total 4-1/2"
Rp
9.047.288
YG-1 Tool Company 04481 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 2", Loc 2", Panjang Total 5-3/4"
Rp
7.768.623
YG-1 Tool Company 04478 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 2", Loc 2", Panjang Total 4-1/2"
Rp
10.347.718
YG-1 Tool Company 02482 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 2", Loc 3", Panjang Total 6-3/4"
Rp
8.852.691
YG-1 Tool Company 02477 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 2", Loc 3", Panjang Total 5-1/2"
Rp
4.027.050
YG-1 Tool Company 02426 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1", Loc 3", Panjang Total 5-1/2"
Rp
9.139.870
YG-1 Tool Company 01480 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 2", Lokator 2", Panjang Total 5-3/4"
Rp
2.715.162
Osg 5580500 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/8", Jarak 2-1/2", Panjang Total 4-1/4"
MOQ: 2
Rp
1.958.261
Osg 5580300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Jarak 1-3/4", Panjang Total 3-9/16"
MOQ: 2
Rp
1.827.624
Osg 5570500 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/8", Jarak 2-1/2", Panjang Total 4-1/4"
MOQ: 2
Rp
1.756.347
Osg 5570300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Jarak 1-3/4", Panjang Total 3-9/16"
Rp
4.190.633
Osg 5484100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/4", Jarak 2-1/4", Panjang Total 4-1/2"
Rp
4.359.048
Osg 5464500 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 7/8", Jarak 3-1/2", Panjang Total 5-3/4"
Rp
4.359.048
Osg 5464100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 7/8", Jarak 3-1/2", Panjang Total 5-3/4"
Rp
3.360.062
Osg 5462500 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 5/8", Jarak 2-1/2", Panjang Total 4-5/8"
Rp
3.368.161
Osg 5462100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Jarak 2-1/2", Panjang Total 4-5/8"
MOQ: 2
Rp
1.779.401
Osg 5460500 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/8", Jarak 1-1/2", Panjang Total 3-1/4"
MOQ: 2
Rp
1.802.500
Osg 5460400 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/16", Jarak 1-3/8", Panjang Total 3-1/8"
MOQ: 2
Rp
1.779.401
Osg 5460300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Jarak 1-1/4", Panjang Total 3-1/16"
Rp
4.071.132
Osg 5454100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 7/8", Jarak 3-1/2", Panjang Total 5-3/4"
Rp
3.171.079
Osg 5452100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Jarak 2-1/2", Panjang Total 4-5/8"
MOQ: 2
Rp
1.939.763
Osg 5451000 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 7/16", Jarak 1-3/4", Panjang Total 3-3/4"
MOQ: 2
Rp
1.607.443
Osg 5450500 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/8", Jarak 1-1/2", Panjang Total 3-1/4"
MOQ: 2
Rp
1.607.443
Osg 5450400 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/16", Jarak 1-3/8", Panjang Total 3-1/8"
MOQ: 2
Rp
1.572.333
Osg 5450300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Jarak 1-1/4", Panjang Total 3-1/16"
Rp
3.953.564
Osg 5432100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur, Diameter Mata Bor 5/8", Lokasi 1-3/8", Panjang Total 5"
Rp
3.538.371
Osg 5431100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur, Diameter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
3.088.344
Osg 5429700 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur, Diameter Mata Bor 15/32", Lokasi 1", Panjang Total 4-1/8"
Rp
3.181.386
Osg 5429600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur, Diameter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
2.931.064
Osg 5429500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur, Diameter Mata Bor 13/32", Lokasi 1", Panjang Total 4-1/8"
1
9
10
11
12
13
15
Atas