Malaysia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "end cobalt flute dia"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1/4", 3/4", 1 1/4", 1/2", 1/8"
Flute Length
1 5/8", 1.625", 13/16", 0.8125", 12 mm, 0.098", 4.2 mm
Overall Length
6 1/2", 4 3/4", 3 3/4", 3 1/8", 4 1/4"
R Size
0.09", 0.03", 0.25", 0.06", 0.12"
Number of Flutes
7, 4, 3, 2, 6
Square End Mills
941 Items
Shank Diameter
16 mm, 12 mm, 10 mm, 3/16"
Outer Diameter
0.625", 5/8", 1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32"
Flute Length
0.3125", 5/16", 1/2", 0.5", 0.75", 3/4", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
8, 6, 4, 7
Brands
2 Hasil
OSG
965 Produk
Cleveland
245 Produk
Produk
2,030 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 3 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
2.933.487
Osg 5260300 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Pemotong 1/4", Loc 5/8", Panjang Keseluruhan 3-1/16"
Rp
7.670.122
Osg 5216100
End
Mill Ujung Bola: Kobalt, 2
Flute
,
Dia
meter Mill 1-1/4", Loc 2-1/2", Oal 5"
MOQ: 2
Rp
1.892.140
Osg 5828400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 6,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.869.984
Osg 5828300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 5,5 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.602.044
Osg 5827400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 2 mm, Jarak 5,95 mm, Panjang Total 57,1 mm
Rp
5.100.678
Osg 5823200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 20 mm, Jarak 39,68 mm, Panjang Total 139,7 mm
Rp
3.716.986
Osg 5821400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 15 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.711.114
Osg 5821300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 14 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.658.820
Osg 5821200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13 mm, Jarak 28,57 mm, Panjang Total 114,3 mm
Rp
3.080.829
Osg 5821100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 12 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.102.802
Osg 5820900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11 mm, Jarak 20,63 mm, Panjang Total 95,2 mm
Rp
3.040.507
Osg 5820800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 10 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Keseluruhan 95,2 mm
MOQ: 2
Rp
1.815.625
Osg 5820500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 7 mm, Jarak 14,28 mm, Panjang Total 79,3 mm
MOQ: 2
Rp
1.794.524
Osg 5820200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 4 mm, Jarak 11,11 mm, Panjang Total 79,3 mm
Rp
3.941.301
Osg 5432100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Total 5"
Rp
3.527.396
Osg 5431100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
3.078.765
Osg 5429700 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 15/32", Lokasi 1", Panjang Total 4-1/8"
Rp
3.171.518
Osg 5429600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
2.921.973
Osg 5429500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 13/32", Lokasi 1", Panjang Total 4-1/8"
Rp
3.451.202
Osg 5422100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Total 5"
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
3.030.553
Osg 5421100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
4.236.948
Osg 5329800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 9/16", Jarak 1-3/8", Panjang Total 5"
Rp
3.451.202
Osg 5329600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 7/16", Lokasi 1", Panjang Total 4-1/8"
Rp
4.236.948
Osg 5322100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 5/8", Lokasi 1-3/8", Panjang Keseluruhan 5"
Rp
3.451.202
Osg 5321100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 3 Alur,
Dia
meter Mata Bor 1/2", Lokasi 1", Panjang Total 4-1/8"
Rp
4.632.276
Osg 5227500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 23/32", Lokasi 1-5/16", Panjang Total 5"
Rp
4.632.276
Osg 5227400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 21/32", Lokasi 1-5/16", Panjang Total 5"
Rp
4.327.087
Osg 5223100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 3/4", Lokasi 1-5/16", Panjang Total 5"
Rp
4.530.714
Cleveland C33000 Square
End
Mill:
Cobalt
, Dilapisi Ticn, Ujung Ganda, 4
Flute
,
Dia
meter Mill 5/8", Loc 1-3/8"
Rp
11.058.708
Osg 5306400 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 4-1/2"
Rp
10.425.946
Osg 5207400 Mata Bor Ujung Persegi: Kobalt, 2 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 5-3/4"
Rp
13.603.428
Osg 4926100 Mata Bor Kasar: Kobalt, 6 Alur,
Dia
meter Mata Bor 2", Lokasi 2", Panjang Total 4-1/2"
Rp
5.673.118
Osg 4710000 Mata Bor Kasar: Kobalt, 5 Alur,
Dia
meter Mata Bor 1", Lokasi 1", Panjang Total 3-1/2"
Rp
5.150.862
YG-1 Tool Company 44426 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 1", Loc 4", OAL 6-1/2"
Rp
4.908.886
YG-1 Tool Company 43426 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 1", Loc 2", Oal 4-1/2"
Rp
9.787.266
YG-1 Tool Company 41478 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Pisau 2", Loc 2-1/2", OAL 5"
Rp
3.675.196
Osg 5449700 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 7/16", Loc 1-1/4", OAL 3-1/4"
Rp
6.826.118
Osg 5444100 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 7/8", Loc 1-7/8", Oal 4-1/8"
Rp
5.147.467
Osg 5443100 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 3/4", Loc 1-5/8", Oal 3-7/8"
Rp
4.839.985
Osg 5442100 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 5/8", Loc 1-5/8", OAL 3-3/4"
Rp
3.749.188
Osg 5441100 Ball
End
Mill: Kobalt, 4
Flute
,
Dia
meter Mill 1/2", Loc 1-1/4", Oal 3-1/4"
Rp
4.969.253
Osg 5263100 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Frais 3/4", Loc 1-5/8", Oal 5-3/8"
Rp
4.489.750
Osg 5262100 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Mill 5/8", Loc 1-3/8", OAL 4-5/8"
Rp
4.293.050
Osg 5213100 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Mill 3/4", Loc 1-5/8", Oal 3-7/8"
Rp
4.478.603
Osg 5211500 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Mill 3/4", Loc 1-5/16", Oal 3-5/16"
Rp
3.802.079
Osg 5211300 Ball
End
Mill: Kobalt, 2
Flute
,
Dia
meter Mill 5/8", Loc 1-1/8", OAL 3-1/8"
Rp
3.879.465
Osg 5829300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 14,5 mm, Jarak Antar Mata Bor 28,57 mm, Panjang Total 114,3 mm
Rp
3.879.465
Osg 5829200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 13,5 mm, Jarak Antar Mata Bor 28,57 mm, Panjang Total 114,3 mm
Rp
3.155.968
Osg 5829100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 12,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
Rp
3.155.968
Osg 5828900 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 11,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
Rp
3.105.279
Osg 5828800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 10,5 mm, Jarak Antar Mata Bor 20,63 mm, Panjang Total 95,2 mm
MOQ: 2
Rp
1.602.044
Osg 5827500 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 2,5 mm, Jarak Antar Mata Bor 7,14 mm, Panjang Total 57,1 mm
MOQ: 2
Rp
1.725.532
Osg 5827200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur,
Dia
meter Mata Bor 1,5 mm, Jarak Antar Mata Bor 4,76 mm, Panjang Total 57,1 mm
MOQ: 2
Rp
1.873.654
Osg 5688000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/16", Jarak 0,98", Panjang Total 3-3/8"
MOQ: 2
Rp
1.851.681
Osg 5687800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/32", Jarak 0,854", Panjang Total 3-1/4"
MOQ: 2
Rp
1.851.681
Osg 5687600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/8", Jarak 0,732", Panjang Total 3-1/8"
MOQ: 2
Rp
1.873.654
Osg 5687400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/32", Jarak 0,279", Panjang Total 2-5/8"
MOQ: 2
Rp
1.664.751
Osg 5678000 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 3/16", Jarak 0,48", Panjang Total 2-1/4"
MOQ: 2
Rp
1.664.751
Osg 5677800 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 5/32", Jarak 0,417", Panjang Total 2-1/4"
MOQ: 2
Rp
1.658.559
Osg 5677600 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 4 Alur,
Dia
meter Mata Bor 1/8", Jarak 0,362", Panjang Total 2-1/4"
1
2
3
4
5
15
Atas