Malaysia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "cobalt flute oal"
Specification Tables
2 Hasil
Ball End Mills
1627 Items
Shank Diameter
1/4", 3/4", 1 1/4", 1/2", 1/8"
Flute Length
1 5/8", 1.625", 13/16", 0.8125", 12 mm, 0.098", 4.2 mm
Overall Length
6 1/2", 4 3/4", 3 3/4", 3 1/8", 4 1/4"
R Size
0.09", 0.03", 0.25", 0.06", 0.12"
Number of Flutes
7, 4, 3, 2, 6
Square End Mills
941 Items
Shank Diameter
16 mm, 12 mm, 10 mm, 3/16"
Outer Diameter
0.625", 5/8", 1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32"
Flute Length
0.3125", 5/16", 1/2", 0.5", 0.75", 3/4", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
8, 6, 4, 7
Brands
3 Hasil
OSG
927 Produk
YG-1 TOOL COMPANY
794 Produk
Cleveland
172 Produk
Produk
1,893 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 6 of 15
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
3.703.612
Osg 5402600 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 15/16", Jarak 1-7/8", Panjang Total 4"
Rp
3.463.921
Osg 5402500 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 7/8", Jarak 1-7/8", Panjang Total 4"
Rp
3.463.921
Osg 5402400 Mata Bor Ujung Persegi: Kobalt, 6 Alur, Diameter Mata Bor 13/16", Jarak 1-7/8", Panjang Total 4"
MOQ: 2
Rp
1.661.172
Osg 5400700 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/2", Lokasi 1", Panjang Total 2-11/16"
MOQ: 2
Rp
1.614.716
Osg 5400600 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 7/16", Lokasi 1", Panjang Total 2-11/16"
Rp
3.703.612
Osg 5363100 Mata Bor Ujung Persegi: Kobalt, 3 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
4.093.905
Osg 5353100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
3.744.037
Osg 5312500 Mata Bor Ujung Persegi: Kobalt, 3 Alur, Diameter Mata Bor 7/8", Jarak 1-7/8", Panjang Total 4"
MOQ: 2
Rp
1.883.828
Osg 5310700 Mata Bor Ujung Persegi: Kobalt, 3 Alur, Diameter Mata Bor 1/2", Lokasi 1", Panjang Total 2-11/16"
MOQ: 2
Rp
1.886.314
Osg 5310600 Mata Bor Ujung Persegi: Kobalt, 3 Alur, Diameter Mata Bor 7/16", Lokasi 1", Panjang Total 2-11/16"
MOQ: 2
Rp
1.887.465
Osg 5300600 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 7/16", Lokasi 1", Panjang Total 2-11/16"
Rp
3.047.615
Osg 5252100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 5/8", Lokasi 2", Panjang Total 4-1/8"
Rp
3.850.991
Osg 4909900 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 7/16", Lokator 1", Panjang Total 2-11/16"
Rp
5.418.745
Osg 4901500 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
5.349.176
Osg 4901100 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
4.483.139
Osg 4900800 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Lokasi 3", Panjang Total 5-1/8"
Rp
3.765.400
Osg 4900600 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Lokasi 2", Panjang Total 4-1/8"
Rp
5.349.176
Osg 4701500 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
4.749.764
Osg 4700600 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Lokasi 2", Panjang Total 4-1/8"
Rp
4.150.674
Osg 4500300 Mata Bor Kasar: Kobalt, 4 Alur, Pitch Halus, Diameter Mata Bor 1/2", Lokasi 2", Panjang Total 4"
Pencarian Terkait "cobalt flute oal"
cobalt
flute
dia
oal
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
Rp
7.038.986
Osg 4401500 Mata Bor Kasar: Kobalt, 4 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
6.313.835
Osg 4301500 Mata Bor Kasar: Kobalt, 3 Alur, Diameter Mata Bor 3/4", Lokasi 3", Panjang Total 5-1/4"
Rp
3.047.477
Cleveland C32726 Square End Mill:
Cobalt
, Dilapisi Ticn, 4
Flute
, Diameter Mill 1/2", Loc 3", Panjang Total 5"
Rp
3.970.698
YG-1 Tool Company 44359 Mata Frais Ujung Bola: Kobalt, 4 Alur, Diameter Frais 3/4", Panjang Potong 3", Panjang Keseluruhan 5-1/4"
Rp
2.689.966
YG-1 Tool Company 41321CN Ball End Mill: Kobalt, Berlapis Tin, 2 Alur, Diameter Pemotong 1/2", Loc 1",
Oal
3"
Rp
4.347.731
Osg 5823100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 19 mm, Jarak 33,33 mm, Panjang Total 127 mm
Rp
4.343.035
Osg 5822300 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 18 mm, Jarak 33,33 mm, Panjang Total 127 mm
Rp
4.343.035
Osg 5822200 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 17 mm, Jarak 33,33 mm, Panjang Total 127 mm
Rp
4.343.035
Osg 5822100 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 16 mm, Jarak 33,33 mm, Panjang Total 127 mm
MOQ: 2
Rp
1.822.317
Osg 5820400 Mata Bor Ujung Persegi: Kobalt, Ujung Ganda, 2 Alur, Diameter Mata Bor 6 mm, Loc 1/2", Panjang Total 79,3 mm
MOQ: 2
Rp
1.919.556
Osg 5819300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 14,5 mm, Jarak Antar Mata Bor 34,92 mm, Panjang Keseluruhan 85,7 mm
MOQ: 2
Rp
1.919.556
Osg 5819200 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 13,5 mm, Jarak Antar Mata Bor 34,92 mm, Panjang Keseluruhan 85,7 mm
MOQ: 2
Rp
1.390.725
Osg 5818400 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 6,5 mm, Jarak Antar Mata Bor 15,87 mm, Panjang Total 61,9 mm
MOQ: 2
Rp
1.390.725
Osg 5818300 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5,5 mm, Jarak Antar Mata Bor 14,28 mm, Panjang Total 61,9 mm
MOQ: 2
Rp
1.396.020
Osg 5818100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3,5 mm, Jarak Antar Mata Bor 11,11 mm, Panjang Total 60,3 mm
Rp
2.744.525
Osg 5417100 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/8", Lokasi 3/8", Panjang Total 2-1/8"
Rp
2.732.600
Osg 5417000 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/4", Lokasi 1/4", Panjang Total 2-1/16"
Rp
3.463.921
Osg 5412000 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 5/8", Lokasi 5/8", Panjang Total 2-3/4"
Rp
3.064.374
Osg 5411000 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 1/2", Lokasi 1/2", Panjang Total 2-1/2"
MOQ: 2
Rp
1.597.911
Osg 5410200 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
MOQ: 2
Rp
1.393.534
Osg 5400200 Mata Bor Ujung Persegi: Kobalt, 4 Alur, Diameter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
Rp
9.940.834
Osg 5356200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/2", Jarak 4", Panjang Total 6-1/2"
Rp
8.044.852
Osg 5356100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/4", Jarak 4", Panjang Total 6-1/2"
MOQ: 2
Rp
1.538.794
Osg 5310200 Mata Bor Ujung Persegi: Kobalt, 3 Alur, Diameter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-3/8"
Rp
9.261.126
Osg 5306300 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-3/4", Lokasi 2", Panjang Total 4-1/2"
Rp
7.625.277
Osg 5306200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/2", Lokasi 2", Panjang Total 4-1/2"
Rp
6.357.804
Osg 5306100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/4", Lokasi 2", Panjang Total 4-1/2"
Rp
4.581.989
Osg 5303300 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1", Jarak 1-7/8", Panjang Total 4-1/8"
Rp
7.146.493
Osg 5276100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/4", Lokasi 3", Panjang Total 7-1/4"
Rp
5.567.412
Osg 5275100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1", Jarak 2-1/2", Panjang Total 7-1/4"
MOQ: 2
Rp
1.678.668
Osg 5270200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 3/16", Lokator 1/2", Panjang Total 2-11/16"
Rp
9.005.412
Osg 5256300 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-3/4", Lokasi 3", Panjang Total 5-1/2"
Rp
7.468.966
Osg 5256200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/2", Lokasi 3", Panjang Total 5-1/2"
Rp
6.449.012
Osg 5256100 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/4", Lokasi 3", Panjang Total 5-1/2"
Rp
6.449.012
Osg 5255300 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/4", Lokasi 3", Panjang Total 5-1/2"
Rp
5.997.853
Osg 5255200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 1-1/8", Lokasi 3", Panjang Total 5-1/2"
MOQ: 2
Rp
1.832.354
Osg 5209700 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 15/32", Lokasi 13/16", Panjang Total 2-1/2"
MOQ: 2
Rp
1.830.282
Osg 5209500 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 13/32", Lokasi 13/16", Panjang Total 2-1/2"
MOQ: 2
Rp
1.457.807
Osg 5209200 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 7/32", Lokator 1/2", Panjang Total 2-5/16"
Rp
8.863.651
Osg 5206400 Mata Bor Ujung Persegi: Kobalt, 2 Alur, Diameter Mata Bor 2", Jarak 1-5/8", Panjang Total 4-1/8"
1
4
5
6
7
8
15
Atas