Malaysia
Hubungi Kami
Tentang Kami
Login
|
Daftar
Press
to jump to the search box
Daftar Belanja
0
Keranjang
Lihat Semua Kategori
Lihat Semua Merek
View All Spec Tables
IDR - Rp
Hasil Pencarian Untuk "coated dia loc 19"
Specification Tables
3 Hasil
Radius End Mills
3367 Items
Shank Diameter
7/32", 9/32", 3/16", 1/4", 5/8"
Outer Diameter
1/8", 0.125", 0.3125", 5/16", 3/8", 0.375", 0.75", 3/4", 1/32", 0.03125"
Flute Length
0.0398", 0.0268", 0.0531", 3/32", 0.09375", 1/2", 0.5"
Overall Length
3 1/2", 6 1/2", 3", 6", 2 1/2"
R Size
0.015", 0.12", 0.0156", 0.0469", 0.0313"
Ball End Mills
1627 Items
Shank Diameter
1/4", 3/4", 1 1/4", 1/2", 1/8"
Flute Length
1 5/8", 1.625", 13/16", 0.8125", 12 mm, 0.098", 4.2 mm
Overall Length
6 1/2", 4 3/4", 3 3/4", 3 1/8", 4 1/4"
R Size
0.09", 0.03", 0.25", 0.06", 0.12"
Number of Flutes
7, 4, 3, 2, 6
Square End Mills
941 Items
Shank Diameter
16 mm, 12 mm, 10 mm, 3/16"
Outer Diameter
0.625", 5/8", 1/8", 0.125", 0.21875", 7/32", 0.15625", 5/32"
Flute Length
0.3125", 5/16", 1/2", 0.5", 0.75", 3/4", 7/16", 0.4375"
Overall Length
1 11/32", 3 1/8", 1 17/32", 3 1/4"
Number of Flutes
8, 6, 4, 7
Brands
3 Hasil
OSG
92 Produk
APPROVED VENDOR
24 Produk
Cleveland
9 Produk
Produk
125 Hasil
All Filters
Reset
0
Harga
Kategori
Merek
Page 1 of 3
Relevansi
Harga: Tetinggi Ke Terendah
Harga: Terendah Ke Tertinggi
Rp
2.871.673
Osg 8556200 Corner Radius End Mill: Karbida, Berlapis Duarise, 4 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm
Rp
3.642.154
Osg 37700026 Corner Radius End Mill: Karbida, Berlapis Wxl, 2 Flute,
Dia
. Mill 8 Mm,
Loc
19
Mm, Rad. 2 Mm
Rp
2.871.673
Osg 8556180 End Mill Radius Sudut: Karbida, Dilapisi Duarise, 4 Alur,
Dia
meter Mill 8 Mm,
Loc
19
Mm
Rp
2.871.673
Osg 8556170 End Mill Radius Sudut: Karbida, Berlapis Duarise, 4 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm
Rp
2.871.673
Osg 8556160 End Mill Radius Sudut: Karbida, Berlapis Duarise, 4 Flute,
Dia
meter Mill 8 Mm,
LOC
19
Mm
MOQ: 2
Rp
1.873.686
Osg 403-2969-BN11 Ball End Mill: Karbida, Berlapis Tialn, 3 Flute,
Dia
meter Mill
19
/64",
Loc
13/16", Oal 2-1/2"
MOQ: 2
Rp
1.863.083
Osg 404-2969-BN11 Ball End Mill: Karbida, Berlapis TiAlN, 4 Flute,
Dia
meter Mill
19
/64",
Loc
13/16", OAL 2-1/2"
MOQ: 2
Rp
1.864.521
Osg 402-2969-BN11 Ball End Mill: Karbida, Dilapisi Tialn, 2 Flute,
Dia
meter Mill
19
/64",
Loc
13/16", Oal 2-1/2"
Rp
3.620.320
Osg 37710015 End Mill Radius Sudut: Karbida, Berlapis Wxl, 4 Alur,
Dia
. Mill 8 Mm,
Loc
19
Mm, Radius 1.5 Mm
MOQ: 2
Rp
1.585.485
Osg 403-2362-BN11 Ball End Mill: Karbida, Berlapis TiAlN, 3 Flute,
Dia
meter Mill 6 Mm,
LOC
19
Mm, OAL 64 Mm
Rp
3.620.320
Osg 37710016 End Mill Radius Sudut: Karbida, Berlapis Wxl, 4 Flute,
Dia
meter Mill 8 mm,
Loc
19
mm, Radius 2 mm
MOQ: 2
Rp
1.261.389
223-001460C Ball End Mill: Karbida, Berlapis TiCN, 4 Flute,
Dia
. Mill 6 Mm,
Loc
19
Mm, OAL 63 Mm
MOQ: 2
Rp
1.832.354
Osg 404-2756-BN11 Ball End Mill: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Milling 7 Mm,
Loc
19
Mm, Oal 64 Mm
MOQ: 2
Rp
1.708.897
Osg 404-2362-BN11 Ball End Mill: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Mill 6 Mm,
Loc
19
Mm, Oal 64 Mm
MOQ: 2
Rp
1.735.897
Osg 402-2362-BN11 Ball End Mill: Karbida, Berlapis TiAlN, 2 Flute,
Dia
meter Mill 6 Mm,
LOC
19
Mm, OAL 64 Mm
MOQ: 2
Rp
1.871.260
Osg HP421-2362-BN Ball End Mill: Karbida, Berlapis Tialn, 2 Flute,
Dia
meter Mill 6 Mm,
Loc
19
Mm, Oal 64 Mm
Rp
3.023.253
Osg HP434-3151 End Mill Radius Sudut: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Mill 8 Mm,
LOC
19
Mm, Radius 1 Mm
MOQ: 2
Rp
1.384.576
204-021145 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 2 Alur,
Dia
meter Mata Bor
19
/64",
Loc
13/16
MOQ: 2
Rp
1.360.181
204-001148 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 2 Alur,
Dia
meter Mata Bor
19
/64", Lokasi 13/16"
Rp
3.043.470
Osg HP432-3153 Corner Radius End Mill: Karbida, Berlapis Tialn, 2 Flute,
Dia
meter Frais 8 mm,
LOC
19
mm, Radius 2 mm
Rp
3.043.470
Osg HP432-3151 End Mill Radius Sudut: Karbida, Berlapis Tialn, 2 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm, Radius 1 Mm
Rp
3.642.154
Osg 37700025 End Mill Radius Sudut: Karbida, Berlapis Wxl, 2 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm, Radius 1.5 Mm
Rp
3.642.154
Osg 37700023 End Mill Radius Sudut: Karbida, Berlapis Wxl, 2 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm, Radius 0.5 Mm
Rp
3.023.253
Osg HP434-3152 Corner Radius End Mill: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Mill 8 Mm,
Loc
19
Mm, Rad 1.5 Mm
Rp
3.023.253
Osg HP434-3150 End Mill Radius Sudut: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Mill 8 Mm,
LOC
19
Mm, Radius 0.5 Mm
Rp
2.837.080
Osg HP421-2756-BN End Mill Ujung Bola: Karbida, Dilapisi TiAlN, 2 Alur,
Dia
meter Frais 7 Mm,
LOC
19
Mm, OAL 64 Mm
MOQ: 2
Rp
1.384.576
206-021147 Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor
19
/64",
Loc
13/16
MOQ: 2
Rp
1.360.181
206-001145 Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur,
Dia
meter Mata Bor
19
/64", Lok 13/16"
Rp
3.043.470
Osg HP432-3150 Corner Radius End Mill: Karbida, Dilapisi Tialn, 2 Flute,
Dia
meter Frais 8 Mm,
Loc
19
Mm, Radius 0.5 Mm
MOQ: 2
Rp
1.222.752
221-001460A Ball End Mill: Karbida, Dilapisi Tin, 2 Flute,
Dia
meter Mill 6 Mm,
Loc
19
Mm, OAL 63 Mm
MOQ: 2
Rp
1.438.846
Cleveland C76220 Square End Mill: Karbida, Dilapisi Alcrn, 2 Flute,
Dia
meter Mill 0,1",
Loc
19
/64", Panjang Total 1-1/2"
Rp
3.376.012
Cleveland C33268 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Ticn, 4 Flute,
Dia
meter Mill
19
/32",
Loc
1-3/8"
MOQ: 2
Rp
1.438.846
Cleveland C76255 Mata Bor Ujung Persegi: Karbida, Dilapisi Alcrn, 4 Alur,
Dia
meter Mata Bor 0,1", Lokus
19
/64", Panjang Total 1-1/2"
Rp
3.279.152
Cleveland C33210 Square End Mill: Baja Kecepatan Tinggi, Dilapisi Timah, 4 Flute,
Dia
meter Mill
19
/32",
Loc
1-3/8"
Rp
5.508.292
Osg 91400811 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxs, 6 Alur,
Dia
meter Mata Bor 8 mm, Jarak
19
mm, Panjang Total 60 mm
Rp
5.437.848
Osg 3130590 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxl, 4 Alur,
Dia
meter Mata Bor 9 mm, Jarak
19
mm, Panjang Total 70 mm
Rp
3.573.283
Osg 3130580 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxl, 4 Alur,
Dia
meter Mata Bor 8 mm, Jarak
19
mm, Panjang Total 60 mm
MOQ: 2
Rp
1.222.752
223-001460A Ball End Mill: Karbida, Berlapis TiN, 4 Flute, 6 Mm
Dia
meter Milling,
19
Mm
Loc
, 63 Mm Oal
MOQ: 2
Rp
1.762.539
Osg HP441-2362 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 64 mm
MOQ: 2
Rp
1.738.278
Osg 404-275611 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 7 mm, Jarak
19
mm, Panjang Total 64 mm
Rp
2.659.936
Osg 5741708 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor
19
/32",
Loc
1-3/8", Panjang Total 3-3/8"
Rp
2.745.610
Osg 5731708 Mata Bor Ujung Persegi: Baja Kecepatan Tinggi, Dilapisi Ticn, 2 Alur,
Dia
meter Mata Bor
19
/32",
Loc
1-1/8", Panjang Total 3-1/8"
MOQ: 2
Rp
1.672.597
Osg HP460-2362 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 3 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 64 mm
Rp
2.642.325
Osg HP441-2756 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 7 mm, Jarak
19
mm, Panjang Total 64 mm
MOQ: 2
Rp
1.510.863
Osg 404-236211 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 64 mm
MOQ: 2
Rp
1.742.591
Osg 403-275611 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 3 Alur,
Dia
meter Mata Bor 7 mm, Jarak
19
mm, Panjang Total 64 mm
MOQ: 2
Rp
1.509.560
Osg 403-236211 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 3 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 64 mm
Rp
5.582.330
Osg 3182095 Mata Bor Ujung Persegi: Karbida, Dilapisi Wxl, 2 Alur,
Dia
meter Mata Bor 9,5 mm, Jarak
19
mm, Panjang Total 70 mm
MOQ: 2
Rp
1.769.143
Osg 404-296911 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor
19
/64", Lok 13/16", Panjang Keseluruhan 2-1/2"
MOQ: 2
Rp
1.769.143
Osg 402-296911 Mata Bor Ujung Persegi: Karbida, Dilapisi Tialn, 2 Alur,
Dia
meter Mata Bor
19
/64", Lok 13/16", Panjang Keseluruhan 2-1/2"
Rp
3.642.154
Osg 37700024 Corner Radius End Mill: Karbida, Berlapis Wxl, 2 Flute,
Dia
. Mill 8 Mm,
Loc
19
Mm, Rad. 1 Mm
MOQ: 2
Rp
1.390.776
206-001370C Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor 7 mm, Jarak
19
mm, Panjang Total 63 mm
MOQ: 2
Rp
1.358.024
206-001370A Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur,
Dia
meter Mata Bor 7 mm, Jarak
19
mm, Panjang Total 63 mm
MOQ: 2
Rp
1.176.388
206-001360C Mata Bor Ujung Persegi: Karbida, Dilapisi Ticn, 4 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 63 mm
MOQ: 2
Rp
1.158.733
206-001360A Mata Bor Ujung Persegi: Karbida, Dilapisi Timah, 4 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 63 mm
Rp
2.871.673
Osg 8556
19
0 End Mill Radius Sudut: Karbida, Berlapis Duarise, 4 Flute,
Dia
meter Milling 8 Mm,
Loc
19
Mm
MOQ: 2
Rp
1.831.904
Osg 403-2756-BN11 Ball End Mill: Karbida, Berlapis Tialn, 3 Flute,
Dia
meter Mill 7 Mm,
Loc
19
Mm, Oal 64 Mm
Rp
2.763.401
Osg HP400-2362 Mata Bor Kasar: Karbida, Dilapisi Tialn, 4 Alur,
Dia
meter Mata Bor 6 mm, Jarak
19
mm, Panjang Total 64 mm
MOQ: 2
Rp
1.831.904
Osg 402-2756-BN11 Ball End Mill: Karbida, Berlapis Tialn, 2 Flute,
Dia
meter Mill 7 Mm,
Loc
19
Mm, Oal 64 Mm
Rp
2.855.140
Osg HP441-2756-BN Ball End Mill: Karbida, Berlapis Tialn, 4 Flute,
Dia
meter Mill 7 Mm,
Loc
19
Mm, Oal 64 Mm
Pencarian Terkait "coated dia loc 19"
coated
dia
loc
rad
coated
dia
loc
oal
coated
dia
loc
09
coated
dia
loc
015
coated
dia
loc
03
coated
dia
loc
12
coated
dia
loc
06
coated
dia
loc
16
Try Another Search ?
Tips:
Include specific details such as Brand, Category, Model Number, Color, Size, Material, Usage, Specifications...
Need more specific results?
Apply filters here
1
2
3
Atas